Skip to content
LENDAGO

Handover

We take over projects someone else started

We step into a project that has already begun, stabilise it and carry it forward — including when the previous team has stopped answering.

The situation people call us about

Usually the call comes from someone who has already spent a serious share of the budget and holds a product that half works. The developer vanished, left the company, or the relationship broke down, and there is no documentation.

It is an unpleasant position, and far more common than each person in it believes. We do not need explanations about what went wrong; we only care about what can be done from here.

  • The project has been at seventy per cent for months and the number does not move
  • You have no access to the source code or to the server it runs on
  • Every small change breaks something else
  • You cannot tell whether continuing or starting over is cheaper

We start with an audit, not with promises

The first step is a short assessment, paid for separately, at the end of which you receive a written document rather than an opinion over the phone.

  • What the application actually does today, against what it was meant to do
  • The state of the code: what can be recovered, what has to be rewritten, what is dangerous
  • The state of the database and whether the existing data can be kept
  • The security risks found, ordered by severity
  • What is missing before it can go live
  • An estimate for continuing, set against an estimate for rebuilding

We also say when it is not worth continuing

Sometimes the audit concludes that rebuilding costs less than repairing. That is bad news and we deliver it anyway, with the reasoning in the document, not in order to sell a bigger project.

Either way you keep something useful: a document describing exactly what you have, which you can take to anyone, including another team.

Frequently asked questions

What people ask us about project rescue

If your question is not here, write to us — we answer just as directly.

Ask us a question
I do not have the source code. Is anything still possible?

It depends on access. If you can reach the server the application runs on, the code can usually be recovered from there. If you have neither, the first step is regaining access, and what your contract with the previous supplier says matters a great deal.

How long does the audit take?

For an application of ordinary size, one to two weeks. You receive a written document with the findings and two estimates: continuing and rebuilding.

Do you work with the technology my project is written in?

We are strongest with PHP, Symfony and web applications generally. If your project uses a technology we do not cover, we say so in the first conversation so you do not lose time.

From practice

What a project with us looks like, end to end

We have not published a case study on this exact service yet. The ones below are from other projects, but they show how we work: the situation before, the decisions taken along the way, and what we got wrong.

See all case studies

Tell us what you need built or fixed

We answer with the right questions and a concrete first step, not with a generic pitch.